2024-2025 NEW-OTEC retail prices 

  • Land sites from £3750 per Kw net including installation.
  • Offshore sites from £3500 per Kw net excluding installation.
  • The prices are based on a 27 degree average annual warm water temperature, and a 3km to shore 750-1000 meter deep site with 3 meters of elevation above sea-level at point of use.
  • Prices exclude planning and environmental services, electrical connections, power storage, transmission, and ground works.
  • Prices additionally exclude shore works and any action or item that is surplus to the basic required system.
  • Onshore and Offshore customers may be subject to fewer or more costs depending on the customer’s capabilities and location.
  • All prices are subject to market price changes and individual situations.
  • Pricing excludes shipping and travel costs due to the uniqueness of each site.
  • Prices are indicative of a reasonable cost and do not form part of a guarantee.

Net definition: In this case net means after parasitic pumping, this way the price is the cost per Kw of useful electricity. 

2024-2025 SWAC retail prices 

  • From £750 per Kw of cooling.
  • Excluding shipping, installation, and ground works.
  • The pricing is based on a 3 Km to 750 meter depth site.
  • Pricing disclaimers as per NEW-OTEC prices.

 

Discounting

Larger scale plants over 500Kw may be suitable for a discounted price in the case of both SWAC and OTEC when exceptional circumstances permit.

Discounts on larger plants with waste / useful heat may also be possible.

Co2 and reef cooling projects

Please contact us for costs.

Licencing 

For adept organisations licencing may be a possibility. Please contact us.

Finance

We can certainly offer a pay in instalments payment plan.

 

 

0

Your Cart